AUTHORS:
Zhuping Sheng, Texas AgriLife Research, Texas A&M University System; Christopher Brown, New Mexico State University;
Bobby Creel, New Mexico Water Resources Research Institute; Raghavan Srinivasan, Spatial Sciences Laboratory, Texas A&M University System;
Ari Michelsen, Texas AgriLife Research, Texas A&M University System; Michael P. Fahy, El Paso Water Utilities
August 2008
ABSTRACT
Over the last five years, the Paso del Norte Watershed Council’s Coordinated Water Resources Database and GIS Project (Project) was developed to provide improved access to regional water resources data for regional water stakeholders to make timely decisions in water operations and flood control. This report presents major components of the Project developed from August of 2005 through July of 2007 through funding provided by the United States Bureau of Reclamation (USBR) through the Water 2025 Challenge Grant Program to the El Paso Water Utilities, Texas A&M University, and New Mexico State University. Additional documentation of related Project activities is provided through final project reports being submitted by the City of Las Cruces (CLC) and Elephant Butte Irrigation District (EBID) for the work conducted through linked USBR-funded Projects.
Tasks accomplished in the phase of work funded by the USBR include the following specific outcomes, which are detailed in later sections of the report:
Keywords: Paso del Norte watershed, water resources database, GIS map, ArcIMS, data sharing and transfer, user needs assessment, Rio Grande, Rio Grande Project, gage station, surface water flow, groundwater, downloadable Microsoft Access database
Account Number 05-FC040-2392
Download TR344 report in PDF format
Hardcopy of report available from:
New Mexico Water Resources Research Institute, NMSU, Box 30001, MSC 3167, Las Cruces, NM 88003 http://wrri.nmsu.edu/publish/order.html
or Texas Water Resources Institute, Texas A&M University System, College Station, Texas 77843-2118